Kevin@aotewell.com

Whatsapp:+86 159 1408 1759 24/7 Customer Support

6ES7677-2VB42-0GB0 ET 200SP Open Controller, CPU 1515SP PC2 T

6ES7677-2VB42-0GB0 ET 200SP Open Controller, CPU 1515SP PC2 T

Model Number:

Product Type:PLC CPU Controller

Type:

Category:SIMATIC ET 200SP

Plance of Origin:Made in Germany

Warranty:All the Parts one year warranty

Description:SIMATIC ET 200SP Open Controller, CPU 1515SP PC2 T, 8 GB RAM, 128 GB CFast with Windows 10 IoT Enterprise 64-bit and S7-1500 Software Controller CPU 1505SP T pre-installed, Interfaces: 1x Slot CFast, 1x slot SD/MMC, 1x connection for ET 200SP bus Adapter PROFINET, 1x 10/100/1000 Mbit/s Ethernet, 2x USB 3.0, 2x USB 2.0, 1x display port, Documentation on CFast Restore image on CFast  

Product
Article Number (Market Facing Number) 6ES7677-2VB42-0GB0
Product Description SIMATIC ET 200SP Open Controller, CPU 1515SP PC2 T, 8 GB RAM, 128 GB CFast with Windows 10 IoT Enterprise 64-bit and S7-1500 Software Controller CPU 1505SP T pre-installed, Interfaces: 1x Slot CFast, 1x slot SD/MMC, 1x connection for ET 200SP bus Adapter PROFINET, 1x 10/100/1000 Mbit/s Ethernet, 2x USB 3.0, 2x USB 2.0, 1x display port, Documentation on CFast Restore image on CFast
Product family
Product Lifecycle (PLM) PM300:Active Product
Price data
Region Specific PriceGroup / Headquarter Price Group 214 / 214
List Price
Customer Price
Surcharge for Raw Materials None
Metal Factor None
Delivery information
Export Control Regulations AL : N / ECCN : 5A992
Standard lead time ex-works 50 Day/Days
Net Weight (kg) 1,034 Kg
Packaging Dimension 14,20 x 18,90 x 9,20
Package size unit of measure CM
Quantity Unit 1 Piece
Packaging Quantity 1
Additional Product Information
EAN 4047623409915
UPC 804766788321
Commodity Code 85371091
LKZ_FDB/ CatalogID STWINAC
Product Group X0BI
Group Code R251
Country of origin Germany
Compliance with the substance restrictions according to RoHS directive Since: 18.09.2018
Product class A: Standard product which is a stock item could be returned within the returns guidelines/period.
WEEE (2012/19/EU) Take-Back Obligation Yes
REACH Art. 33 Duty to inform according to the current list of candidates